Project Logic

From Hornbill
Revision as of 13:49, 20 January 2021 by Alexrgt (talk | contribs) (→‎Project Risks)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Home > Project Manager > Project Portfolio > Project > Project Logic Index
PmProjectsSettingsProjectLogicIcon.png

Introduction

The Project Logic tab within project settings allows the project manager of each project to configure certain project behaviours.

Related Articles

Project Details

Automatically calculate project RAG status

  • This setting, when active, allows the overall project RAG status to be automatically calculated every time an individual project RAG tolerance is added, updated or removed. This setting also includes the option to select which RAG tolerance matrix the system should use for its calculations. RAG tolerance matrices can be configured in the Hornbill Admin Tool by a user with the Project Administrator role.


PmprojectsettingsProjectLogicProjectDetails.png

Project Costs

Take daily snapshot of total project costs

This setting, when active, will automatically audit the total sum of all project costs at the end of each day. The feature behind this setting has been designed as a way to automatically monitor your total project costs as a project progresses through it's lifecycle. The data that is collected here can be visualised in the Line Chart View which can be found on the Project Costs tab.

PmprojectsettingsProjectLogicProjectCosts.png

Project Risks

Take daily audit of project risks

This setting, when active, will automatically audit each of your Project Risks at the end of each day. The feature behind this setting has been designed as a way to automatically monitor your project risks as a project progresses through it's lifecycle. The data that is collected here can be visualised in the Line Chart View which can be found on the Project Risks tab within the main RAID tab.

PmprojectsettingsProjectLogicProjectRisks.png