Difference between revisions of "Project Logic"

From Hornbill
Jump to navigation Jump to search
Line 35: Line 35:
  
 
=== Automatically calculate project RAG status ===
 
=== Automatically calculate project RAG status ===
CONTENT GOES HERE
+
* This setting, when active, allows the overall project RAG status to be automatically calculated every time an individual project RAG tolerance is added, updated or removed. This setting also includes the option to select which RAG tolerance matrix the system should use for its calculations. '''RAG tolerance matrices''' can be configured in the Hornbill Admin Tool by a user with the '''Project Administrator''' role.
  
 
|}
 
|}

Revision as of 13:36, 20 January 2021

Home > Project Manager > Project Portfolio > Project > Project Logic Index
PmProjectsSettingsProjectLogicIcon.png

Introduction

The Project Logic tab within project settings allows the project manager of each project to configure certain project behaviours.

Related Articles

Project Details

Automatically calculate project RAG status

  • This setting, when active, allows the overall project RAG status to be automatically calculated every time an individual project RAG tolerance is added, updated or removed. This setting also includes the option to select which RAG tolerance matrix the system should use for its calculations. RAG tolerance matrices can be configured in the Hornbill Admin Tool by a user with the Project Administrator role.

Project Costs

Take daily snapshot of total project costs

CONTENT GOES HERE

Project Risks

Take daily audit of project risks

CONTENT GOES HERE