Project Assumptions

From Hornbill
Revision as of 12:00, 18 March 2019 by Stevenb (talk | contribs) (Created page with "<div style="border:1px solid #90C0FF; background:#D0E0FF; width:99%; padding:4px; margin-bottom:10px;"> __NOTOC__ {| style="width:100%" |Home > [[Project Manager...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Home > Project Manager > RAID > Assumptions Index

Introduction

Related Articles

Add a new assumption

RAID Assumptions.png

Use the + icon to add a new assumption to the project

  • Assumption: Provide a name for the assumption
  • Details: Provide details for the assumption
  • Actions: Provide any actions to the assumption
  • Reasons: Provide any supporting reasons for the assumption
  • Review Date: Assign a date to review the assumption
  • Owned By: Assign the assumption an owner (from project members
  • Status: Assign the assumption a status to reflect it's current state.

Manage assumptions

Open an existing assumption by clicking on the assumption from the assumption list view

  • Status: Alter the status of the assumption to indicate if it is still open or closed
  • Audit: All changes to the assumption will be recorded in the audit log.
  • Delete: Delete an assumption by using the trash can icon on each assumptions view

List View

View project assumption, by their name, status, review date and owner

  • Click on an assumption to edit it's properties
  • Search the project assumption from the Search field
  • The search will look for a match with the assumptions name