Risk Events: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
{{bullet1|Category|Select a category that describes the risk event.}} | {{bullet1|Category|Select a category that describes the risk event.}} | ||
{{bullet1|Details|Provide the details of the risk event}} | {{bullet1|Details|Provide the details of the risk event}} | ||
{{bullet1|Status|Default options include Cancelled, Closed, Investigating, Logged, Resolved, Reviewing, and | {{bullet1|Status|Select the status of this risk event. Default options include Cancelled, Closed, Investigating, Logged, Resolved, and Reviewing. (This list can be modified by a user with the [[GRC_Manager_Roles#Available_Roles|GRC Administrator Role]] under [[GRC Simple Lists]])}} | ||
{{bullet1|Priority|Select the priority for this risk event. Default options include High, Immediate, Low, and Normal. (This list can be modified by a user with the [[GRC_Manager_Roles#Available_Roles|GRC Administrator Role]] under [[GRC Simple Lists]])}} | |||
External Reference | External Reference | ||
Revision as of 21:37, 5 May 2022
Home > Applications > GRC > Risk Management > Risk Events | Index |
Creating a Risk Event
- Summary
- Write a summary of the risk event that occurred
- Category
- Select a category that describes the risk event.
- Details
- Provide the details of the risk event
- Status
- Select the status of this risk event. Default options include Cancelled, Closed, Investigating, Logged, Resolved, and Reviewing. (This list can be modified by a user with the GRC Administrator Role under GRC Simple Lists)
- Priority
- Select the priority for this risk event. Default options include High, Immediate, Low, and Normal. (This list can be modified by a user with the GRC Administrator Role under GRC Simple Lists)
External Reference
Risk Occurrence Register Risk Asset Source Affected Asset